{"id":452,"date":"2026-10-27T05:39:22","date_gmt":"2026-10-27T05:39:22","guid":{"rendered":"https:\/\/adesman.ro\/?p=452"},"modified":"2026-10-27T05:47:59","modified_gmt":"2026-10-27T05:47:59","slug":"due-diligence-solar-bess-projects-romania","status":"publish","type":"post","link":"https:\/\/adesman.ro\/en\/due-diligence-proiect-fotovoltaic-bess\/","title":{"rendered":"Legal due diligence on the acquisition of a photovoltaic or BESS project in Romania: checklist, RTB and CEISD clearance"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A photovoltaic or battery energy storage system (BESS) project is usually acquired before construction. The investor pays for the land, rights, permits and allocated grid capacity, and the negotiated price rests on the premise that all of these exist, are valid and are consistent with one another. Legal due diligence tests precisely that premise: whether the project can be built, connected and operated within the parameters on which the price offer was based.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">In 2026, the review has become more demanding. Since 25 May 2026, new rules of the Romanian Energy Regulatory Authority (ANRE) on the grid connection and authorisation of generation and storage capacities have applied (ANRE Order No 15\/2026); since 25 August 2026, the authorisation of construction works has been governed by the Code on Spatial Planning, Urban Planning and Construction (Law No 169\/2026); and the foreign investment screening threshold has been raised by Government Emergency Ordinance (GEO) No 17\/2026. For the technical and regulatory aspects specific to storage, you may also consult our guide on <a href=\"https:\/\/adesman.ro\/en\/bess-projects-romania\/\">BESS projects in Romania<\/a>.<\/p>\n\n\n\n<aside class=\"tldr\" data-adesman aria-labelledby=\"tldr1\"><div class=\"tldr__head\"><p class=\"tldr__title\" id=\"tldr1\">In brief<\/p><\/div><ul class=\"tldr__list\" role=\"list\"><li style=\"--i:0\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>Legal due diligence must confirm that the project can be built, connected and operated in the configuration presented to the investor.<\/span><\/li><li style=\"--i:1\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>Since 25 May 2026, ANRE Order No 15\/2026 has increased the guarantee for the issuance of the technical grid connection approval (ATR) from 5% to 20% of the connection tariff excluding VAT for capacities with a total approved export and\/or consumption capacity exceeding 1 MW, and ANRE Order No 16\/2026 has introduced a guarantee of EUR 30\/kW as a condition for obtaining the establishment authorisation (autoriza\u021bie de \u00eenfiin\u021bare), which must be maintained until the date on which the record of acceptance upon completion of the power plant construction works is issued.<\/span><\/li><li style=\"--i:2\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>Grid connection agreements with an approved export capacity exceeding 1 MW that were ongoing on the date ANRE Order No 15\/2026 entered into force must be followed by the obtaining of the establishment authorisation by no later than 25 May 2027; otherwise, the ATR ceases to be valid and the grid connection agreement terminates by operation of law.<\/span><\/li><li style=\"--i:3\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>The concept of ready-to-build (RTB) has no statutory definition. It must be defined in the contract, through an exact list of the documents and conditions that the project must satisfy.<\/span><\/li><li style=\"--i:4\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>The acquisition of an energy project may require clearance from the Commission for the Examination of Foreign Direct Investments (CEISD), including for investors from the EU or from Romania, and, separately, may require notification of the economic concentration (merger control) to the Romanian Competition Council (Consiliul Concuren\u021bei) if the statutory thresholds are met.<\/span><\/li><\/ul><\/aside>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-ce-urmareste-due-diligence-ul-juridic-intr-o-tranzactie-energetica\">1. What legal due diligence seeks to establish in an energy transaction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The acquisition may be carried out either by purchasing the shares in the project company (share deal) or by directly taking over the assets: land, rights, permits and contracts (asset deal). In the first case, the investor takes over the company with its entire history, including its debts and litigation (if any). In the second case, it must be checked which rights and authorisations can actually be transferred to the buyer and on what conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Whatever the structure, the central question is the same: whether the project documents support one another. An ATR issued for a certain capacity, a building permit issued for a different configuration and a right of superficies that expires before the end of the operating period may each, viewed separately, be valid documents. Taken together, they may make the project impossible to finance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The outcome of the review is the due diligence report, which identifies the risks, ranks them and proposes how they should be addressed in the contract to be concluded: conditions precedent, price adjustments, representations and warranties or specific indemnities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-checklist-de-due-diligence-juridic-pentru-proiecte-fotovoltaice-si-bess\">2. Legal due diligence checklist for photovoltaic and BESS projects<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"societatea-proiect-spv\">The project company (SPV)<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the articles of association, the shareholding structure and the ultimate beneficial owner;<\/li>\n\n\n\n<li>encumbrances over the shares and over the company's assets (pledges, mortgages, seizures);<\/li>\n\n\n\n<li>ongoing contracts, commitments given to the developer or to third parties, and change of control clauses;<\/li>\n\n\n\n<li>the tax position, including the special constructions tax due for 2026, the last year of application before its repeal in 2027;<\/li>\n\n\n\n<li>litigation and administrative proceedings.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"terenul\">Land<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The investor must verify title to the land (ownership, superficies, concession or another right in rem), its registration in the land register and the term for which the right was created. The right must cover the entire construction, operation and decommissioning period, as well as access and the route of the connection lines, by means of easements or other rights enforceable against third parties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For agricultural land located outside the built-up area (extravilan), Article 92(2)(j) of Land Law No 18\/1991 permits the siting of renewable generation capacities and electricity storage units on an area of up to 50 ha. The land use category, the land quality class and the procedure for removal of land from agricultural use must also be verified.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The land right also matters for grid connection: under ANRE rules, its existence and extent must be proven when the connection application is filed, and the right must remain valid at least until the end of the year in which final commissioning of the user installation is scheduled.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"urbanismul-si-autorizatia-de-construire\">Urban planning and the building permit<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Since 25 August 2026, the authorisation of construction works has been governed by the Code on Spatial Planning, Urban Planning and Construction (Law No 169\/2026), which replaced Law No 50\/1991 and Law No 350\/2001. As a rule, procedures commenced before that date remain governed by the old law, and urban planning certificates and authorisations issued previously remain valid. The applicable regime must therefore be established for each project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The review covers the urban planning certificate, the urban planning documentation on which the project relies, the required permits and consents, the building permit and its period of validity. Separately, the risk of challenge must be analysed: the building permit may be challenged before the administrative courts by any person who considers themselves aggrieved (as also confirmed by Constitutional Court Decision No 643\/2024). For third parties, time limits run from the date on which they became aware of the permit, which is why the date on which it was publicised, by the means listed in the law, must be carefully documented.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"racordarea-la-retea-si-garantiile\">Grid connection and guarantees<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The review covers the technical grid connection approval (ATR), the grid connection agreement, the approved capacity, the connection point, the voltage level, the grid reinforcement works and the completion deadlines. For a BESS, the ATR must provide for approved capacity both for absorption from the grid and for injection into the grid (export).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under ANRE Order No 15\/2026, in force since 25 May 2026, the financial guarantee for the issuance of the ATR for production or mixed sites with an approved capacity exceeding 1 MW was increased from 5% to 20% of the connection tariff excluding VAT. The guarantee is called if the project does not progress within the prescribed deadlines. The due diligence report must show whether the guarantees have been provided, in what amount, who bears them after closing and in what circumstances they may be called.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Termination of the grid connection agreement, for whatever reason, entails termination of the ATR. Accordingly, any missed deadline in the connection or authorisation procedure must be treated as a major risk to the value of the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"autorizarea-si-licentierea-anre\">ANRE authorisation and licensing<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Generation capacities and storage facilities with a capacity exceeding 1 MW require an establishment authorisation from ANRE. For applications filed after 25 May 2026, ANRE Order No 16\/2026 introduced a guarantee of EUR 30\/kW, calculated by reference to the installed capacity stated in the ATR, which remains valid until final acceptance of the works. Applicants who prove that they have provided the performance guarantee under a contract for difference (CfD) are exempt, among others.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The establishment authorisation must be obtained before the agreement for the execution of the connection installation is concluded, but no later than 12 months after the grid connection agreement is concluded and no later than 18 months after the ATR is issued, with the possibility of extension for delays not attributable to the applicant. For existing grid connection agreements, the transitional deadline is 25 May 2027. Failure to meet these deadlines results in the ATR ceasing to be valid and the grid connection agreement terminating by operation of law.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Commercial operation generally requires an ANRE licence. A BESS added to a generation capacity is included in that capacity's licence, whereas a stand-alone BESS requires its own licence.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"mediul-si-securitatea-la-incendiu\">Environment and fire safety<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The act issued by the environmental authority must correspond to the current configuration of the project. The conditions imposed (monitoring, water collection, noise limits) are reflected in costs and in the timetable. For BESS, fire safety requirements concerning battery technology, safety distances and emergency access routes may limit the usable area and, consequently, the capacity that can be installed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"contractele-proiectului\">Project contracts<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The review covers the EPC contract, the equipment supply contracts, the operation and maintenance (O&amp;M) contract, the power purchase agreements (PPA) and, where applicable, the contract for difference (CfD). The main focus is on change of control clauses, the consents required for assignment and the guarantees that the counterparty may call.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"litigii-si-contestatii\">Litigation and challenges<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The review covers pending litigation concerning the land, authorisations or contracts, administrative challenges against urban planning and environmental acts, and any ANRE proceedings. Lenders usually require confirmation that the time limits for challenges have expired or that there is no litigation affecting the project.<\/p>\n\n\n\n<p class=\"adesman-cta-lead wp-block-paragraph\">Are you assessing the acquisition of a photovoltaic or BESS project? We review the project documents and tell you which risks need to be covered in the contract before signing.<\/p>\n\n\n<p class=\"cta-line\"><a class=\"btn\" href=\"https:\/\/adesman.ro\/en\/contact\/\"><span class=\"btn__label\">Book a consultation<\/span><span class=\"btn__icon\" aria-hidden=\"true\"><svg viewbox=\"0 0 24 24\"><path d=\"M5 12h13M13 6l6 6-6 6\"\/><\/svg><\/span><\/a><\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"3-ready-to-build-de-ce-trebuie-definit-in-contract\">3. Ready-to-build: why it must be defined in the contract<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In transactional practice, a project is considered ready-to-build (RTB) when it holds all the rights, permits and authorisations required to start works. However, the concept has no statutory definition and is used with different meanings in transactions. Disagreement usually surfaces only when payment falls due.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Accordingly, the acquisition agreement must list specifically the documents and conditions that make up RTB status: land rights registered in the land register and granted for a period sufficient to cover the construction, operation and decommissioning of the project; a building permit within its period of validity; the ATR and the grid connection agreement in force, with the related guarantees provided; the establishment authorisation issued by ANRE; the administrative act of the environmental authority; and fire safety permits, where applicable. Each document must be checked against the configuration that will actually be built. A complete set of documents describing different configurations does not amount to an RTB project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where the project is purchased before it reaches RTB status, the price is usually structured in tranches conditional on reaching certain milestones. The contract must settle at least three points:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>what happens if a milestone is not reached on time (for example, a price adjustment or a right of termination (rescission)),<\/li>\n\n\n\n<li>the deadline by which the conditions precedent may be satisfied (long-stop date), and<\/li>\n\n\n\n<li>who bears the risk of the guarantees being called between signing and closing.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Risks identified in the due diligence are addressed differently depending on their nature. A missing or non-compliant document becomes a condition precedent. A quantifiable risk, such as a connection guarantee that may be called, may justify a price adjustment or a specific indemnity. General risks are covered by the seller's representations and warranties, together with the limitations of liability negotiated on a case-by-case basis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-autorizarile-necesare-tranzactiei-ceisd-si-concurenta\">4. Clearances required for the transaction: CEISD and merger control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Authorisation of the project and clearance of the investment are distinct legal matters, involving different authorities, conditions and consequences. An ATR, a building permit or an ANRE authorisation does not replace clearance of the investment where such clearance is mandatory.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under GEO No 46\/2022, as amended by GEO No 17\/2026, the general investment screening threshold is EUR 5 million. The regime also applies to investors from the European Union, including legal entities with their registered office in Romania, and energy and energy infrastructure are among the sectors covered. The direct acquisition of a project's assets may also trigger the clearance requirement, since energy storage and critical energy infrastructure are among the sensitive sectors in which the regime extends to assets. Interdependent transactions carried out by the same investor within a 12-month period are aggregated, so capital increases and construction financing must be factored in from the outset. Investments below the threshold may also be screened if they are liable to affect security or public order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">The investment may not be implemented before clearance is obtained, and failure to comply with this obligation may result in fines of up to 10% of global turnover and in annulment of the investment. Where clearance is required, it is provided for as a condition precedent to closing. The procedure is explained in detail in our article on <a href=\"https:\/\/adesman.ro\/en\/fdi-screening-romania\/\">CEISD clearance of foreign investments<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Independent de examinarea investi\u021biei, tranzac\u021bia poate constitui o concentrare economic\u0103 ce trebuie notificat\u0103 <a href=\"https:\/\/www.consiliulconcurentei.ro\/\">Consiliului Concuren\u021bei<\/a> \u00eenainte de implementare. Potrivit noului Regulament privind concentr\u0103rile economice, aprobat prin Ordinul pre\u0219edintelui Consiliului Concuren\u021bei nr. 2.192\/2026, \u00een vigoare din 1 octombrie 2026, notificarea este obligatorie c\u00e2nd cifra de afaceri cumulat\u0103 a \u00eentreprinderilor implicate dep\u0103\u0219e\u0219te echivalentul a 10 milioane EUR, iar cel pu\u021bin dou\u0103 dintre ele au realizat fiecare \u00een Rom\u00e2nia o cifr\u0103 de afaceri de peste 4 milioane EUR.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5-ce-difera-intre-un-proiect-fotovoltaic-si-un-proiect-bess\">5. How a photovoltaic project differs from a BESS project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a photovoltaic park, legal risks are usually concentrated on the land, the area occupied and the approved export capacity. For a BESS project, the review must additionally cover the bidirectional connection regime, the fire safety requirements specific to batteries and the difference between installed power (MW), storage capacity expressed in MWh and the power that can actually be used commercially.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A BESS added to an existing park (co-located) uses that park's land, transformer substation and connection point. In this case, the due diligence must verify whether adding storage is compatible with the existing ATR, authorisations and licence, or whether these need to be updated:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the ATR and the grid connection agreement, especially if storage involves additional capacity or absorption from the grid. For storage facilities of at least 5 MW added to an existing production site, grid capacity is allocated under ANRE's auction-based methodology;<\/li>\n\n\n\n<li>the building permit and the environmental act, since the configuration of the site changes;<\/li>\n\n\n\n<li>the establishment authorisation and the ANRE licence: the holder must apply for an amendment of the generation capacity's licence to include the storage facility and the activity carried out with it;<\/li>\n\n\n\n<li>the land rights and the project contracts (EPC, O&amp;M, PPA, financing), which may contain restrictions on changes to the configuration.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"concluzii\">Conclusions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The value of an energy project acquired at the development stage is determined by the extent to which its documents allow it to be built, connected and operated. In 2026, the new rules on financial guarantees, authorisation deadlines and the termination of the ATR by operation of law have turned the project timetable into a direct component of the price. Checking these deadlines, defining RTB status in the contract and building the CEISD and merger control clearances into the transaction timetable must be done before signing, while the risks can still be negotiated. After signing, the buyer's options are limited to the protection mechanisms it has negotiated.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"intrebari-frecvente\">Frequently asked questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-verifica-due-diligence-ul-juridic-la-achizitia-unui-parc-fotovoltaic\">What does legal due diligence check when acquiring a photovoltaic park?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The review covers the project company, the land rights, the urban planning documentation and the building permit, the ATR and the grid connection agreement, the guarantees provided, the establishment authorisation and the ANRE licence, the documents issued by the environmental authority, the project contracts and any litigation. The aim is to establish whether the project can be built, connected and operated in the configuration presented to the investor and whether its documents are consistent with one another.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-s-a-schimbat-in-2026-pentru-proiectele-aflate-in-dezvoltare\">What changed in 2026 for projects under development?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Since 25 May 2026, the guarantee for the issuance of the ATR has increased from 5% to 20% of the connection tariff excluding VAT for production sites or consumption and production sites with an approved capacity exceeding 1 MW, and a guarantee of EUR 30\/kW, valid until acceptance of the works, must be provided in order to obtain the establishment authorisation. Existing grid connection agreements must be followed by the obtaining of the establishment authorisation by 25 May 2027; otherwise they terminate by operation of law, together with the ATR. Since 25 August 2026, new applications for the authorisation of construction works have been governed by the Code on Spatial Planning, Urban Planning and Construction (Law No 169\/2026).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-inseamna-ready-to-build\">What does ready-to-build mean?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The stage at which the project holds all the rights, permits and authorisations required to start construction. Because the law does not define the concept, the acquisition agreement must list the specific documents and conditions that make up this stage and relate them to the configuration to be built.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"poate-fi-amplasat-un-proiect-fotovoltaic-sau-bess-pe-teren-agricol\">Can a photovoltaic or BESS project be sited on agricultural land?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, under certain conditions. Land Law No 18\/1991 permits the siting of renewable generation capacities and electricity storage units on agricultural land outside the built-up area (extravilan), up to a limit of 50 ha. The due diligence verifies the land use category, the land quality class and the procedure for removal of land from agricultural use.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"este-necesara-autorizarea-ceisd-pentru-achizitia-unui-proiect-bess\">Is CEISD clearance required for the acquisition of a BESS project?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In many cases, yes. Energy and energy infrastructure are covered sectors. The general screening threshold is EUR 5 million, and the regime also applies to investors from the EU and from Romania. Energy storage and critical energy infrastructure are among the sectors in which the direct acquisition of assets also falls within the scope of the regime. The specific answer depends on the transaction structure, the total value of the investment and the identity of the investor.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"cat-dureaza-un-due-diligence-juridic-pentru-un-proiect-energetic\">How long does legal due diligence on an energy project take?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The duration depends on the project's stage of development, the number of projects reviewed and, above all, the quality and completeness of the data room (VDR). For a photovoltaic or BESS project with documentation properly and fully organised in separate files by category, the review is usually completed within two to four weeks of access to the documents. For project portfolios, for projects with a complex land history or where documents are incomplete, it may take six to eight weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The timetable is usually extended by factors external to the review itself: missing documents that must be requested from the seller, land register extracts or information from the grid operator and the authorities, and clarifications regarding the technical configuration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The duration of the due diligence does not include obtaining the clearances required for the transaction. The CEISD screening and, where applicable, the merger control notification take place after signing, with their own time limits. They must be built into the transaction timetable and into the deadline for satisfaction of the conditions precedent (long-stop date) from the outset.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"cine-suporta-garantiile-de-racordare-dupa-vanzarea-proiectului\">Who bears the connection guarantees after the project is sold?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The guarantees usually remain the responsibility of the project company. The acquisition agreement must establish whether the price includes them, who replaces them at closing and who bears the risk of any call on them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Adesman &amp; Asocia\u021bii assists investors and developers with the due diligence, structuring and negotiation of transactions involving photovoltaic, wind and BESS projects in Romania. Find out more about our <a href=\"https:\/\/adesman.ro\/en\/energy-lawyers-romania\/\">energy law<\/a> practice.<\/p>\n\n\n\n<p class=\"adesman-cta-lead wp-block-paragraph\">Are you preparing the acquisition or sale of an energy project? Talk to our team about due diligence and the transaction documentation.<\/p>\n\n\n<p class=\"cta-line\"><a class=\"btn\" href=\"https:\/\/adesman.ro\/en\/contact\/\"><span class=\"btn__label\">Contact us<\/span><span class=\"btn__icon\" aria-hidden=\"true\"><svg viewbox=\"0 0 24 24\"><path d=\"M5 12h13M13 6l6 6-6 6\"\/><\/svg><\/span><\/a><\/p>\n\n\n<p class=\"wp-block-paragraph translation-block\"><em>This material is provided for general information purposes only and does not constitute legal advice on any particular project or transaction. The applicable legal regime must be analysed in light of the specific characteristics of each project and the legislation in force at the date of the analysis.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Un proiect fotovoltaic sau de stocare a energiei \u00een baterii (BESS) se achizi\u021bioneaz\u0103, de regul\u0103, \u00eenainte de construire. Investitorul pl\u0103te\u0219te pentru teren, drepturi, avize \u0219i capacitatea alocat\u0103 \u00een [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[39,50,43,40,45,46,41],"class_list":["post-452","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energie","tag-bess","tag-ceisd","tag-due-diligence","tag-energie-regenerabila","tag-investitii-energetice","tag-racordare-la-retea","tag-stocarea-energiei"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Due diligence juridic proiect fotovoltaic \u0219i BESS | Ghid 2026<\/title>\n<meta name=\"description\" content=\"Due diligence juridic proiect fotovoltaic sau BESS: teren, ATR, garan\u021biile ANRE din 2026, ready-to-build, CEISD \u0219i Consiliul Concuren\u021bei.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adesman.ro\/en\/due-diligence-solar-bess-projects-romania\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Due diligence juridic proiect fotovoltaic \u0219i BESS | Ghid 2026\" \/>\n<meta property=\"og:description\" content=\"Due diligence juridic proiect fotovoltaic sau BESS: teren, ATR, garan\u021biile ANRE din 2026, ready-to-build, CEISD \u0219i Consiliul Concuren\u021bei.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adesman.ro\/en\/due-diligence-solar-bess-projects-romania\/\" \/>\n<meta property=\"og:site_name\" content=\"Adesman &amp; Asocia\u021bii\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/adesman.asociatii\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T05:39:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T05:47:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Diana Adesman\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Diana Adesman\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/\"},\"author\":{\"name\":\"Diana Adesman\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/person\\\/7348f53c11f4ae0edede533b7c94f135\"},\"headline\":\"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD\",\"datePublished\":\"2026-10-27T05:39:22+00:00\",\"dateModified\":\"2026-10-27T05:47:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/\"},\"wordCount\":3403,\"publisher\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp\",\"keywords\":[\"BESS\",\"CEISD\",\"Due diligence\",\"Energie regenerabil\u0103\",\"Investi\u021bii energetice\",\"Racordare la re\u021bea\",\"Stocarea energiei\"],\"articleSection\":[\"Energie\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/\",\"url\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/\",\"name\":\"Due diligence juridic proiect fotovoltaic \u0219i BESS | Ghid 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp\",\"datePublished\":\"2026-10-27T05:39:22+00:00\",\"dateModified\":\"2026-10-27T05:47:59+00:00\",\"description\":\"Due diligence juridic proiect fotovoltaic sau BESS: teren, ATR, garan\u021biile ANRE din 2026, ready-to-build, CEISD \u0219i Consiliul Concuren\u021bei.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp\",\"width\":1600,\"height\":900,\"caption\":\"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/due-diligence-proiect-fotovoltaic-bess\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adesman.ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/\",\"name\":\"Adesman & Asocia\u021bii\",\"description\":\"Arta dreptului. Excelen\u021b\u0103 \u00een fiecare detaliu.\",\"publisher\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"},\"alternateName\":\"Adesman & Asocia\u021bii\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":[\"Organization\",\"LegalService\"],\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\",\"name\":\"Adesman & Asocia\u021bii\",\"alternateName\":[\"Adesman & Associates\",\"Adesman si Asociatii\",\"\u963f\u5fb7\u65af\u66fc\u5f8b\u5e08\u4e8b\u52a1\u6240\"],\"url\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/adesman-logo-site-1.png\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/adesman-logo-site-1.png\",\"width\":500,\"height\":260,\"caption\":\"Adesman & Asocia\u021bii\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/adesman.asociatii\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adesman-asociatii\\\/\"],\"telephone\":\"+40 31 420 17 48\",\"email\":\"office@adesman.ro\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Str. Aviator Maior \u0218tefan S\u0103n\u0103tescu nr. 64\",\"addressLocality\":\"Bucure\u0219ti\",\"addressRegion\":\"Sector 1\",\"postalCode\":\"011478\",\"addressCountry\":\"RO\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"19:00\"}],\"areaServed\":{\"@type\":\"Country\",\"name\":\"Romania\"},\"foundingDate\":\"2022\",\"hasMap\":\"https:\\\/\\\/www.google.com\\\/maps\\\/search\\\/?api=1&query=Adesman%20%26%20Asocia%C8%9Bii%2C%20Str.%20Aviator%20Maior%20%C8%98tefan%20S%C4%83n%C4%83tescu%2064%2C%20011478%20Bucure%C8%99ti\",\"knowsLanguage\":[\"ro\",\"en\",\"de\",\"fr\",\"es\",\"it\"],\"description\":\"Bucharest law firm: litigation and arbitration, public procurement and PPP, energy, real estate and construction, corporate and M&A, tax and employment law.\",\"knowsAbout\":[\"Litigation and arbitration\",\"Public procurement and PPP\",\"Energy and sustainability law\",\"Renewable energy and battery storage (BESS) projects\",\"Real estate, construction and infrastructure law\",\"Corporate and commercial law\",\"Mergers and acquisitions (M&A)\",\"Tax law\",\"Employment law\",\"Foreign direct investment screening\",\"White-collar crime\",\"Competition law\",\"Enforcement of foreign judgments\"],\"employee\":[{\"@type\":\"Person\",\"name\":\"Diana Adesman\",\"jobTitle\":\"Managing Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/\"},{\"@type\":\"Person\",\"name\":\"Ciprian Nicu\",\"jobTitle\":\"Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/echipa-adesman-asociatii\\\/ciprian-nicu-adesman-asociatii\\\/\"},{\"@type\":\"Person\",\"name\":\"Oana \u0218inca\",\"jobTitle\":\"Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/echipa-adesman-asociatii\\\/oana-sinca-adesman-asociatii\\\/\"},{\"@type\":\"Person\",\"name\":\"Alexandra Jitea\",\"jobTitle\":\"Managing Associate\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/echipa-adesman-asociatii\\\/alexandra-jitea-adesman-asociatii\\\/\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/person\\\/7348f53c11f4ae0edede533b7c94f135\",\"name\":\"Diana Adesman\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Diana-Adesman-1.webp\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Diana-Adesman-1.webp\",\"caption\":\"Diana Adesman\"},\"description\":\"Diana Adesman este Managing Partner \u0219i fondatoarea Adesman &amp; Asocia\u021bii, cu peste 17 ani de experien\u021b\u0103 \u00een avocatur\u0103, dintre care 13 \u00een firme de avocatur\u0103 de renume. Activitatea sa acoper\u0103 litigii complexe, interne \u0219i interna\u021bionale, \u0219i arbitraj comercial, precum \u0219i asisten\u021b\u0103 pentru proiecte imobiliare, de infrastructur\u0103 \u0219i de energie regenerabil\u0103, inclusiv dispute din contracte FIDIC.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/diana-adesman-2b3b4b52\\\/\"],\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/\",\"jobTitle\":\"Managing Partner\",\"worksFor\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Legal Due Diligence for PV and BESS Projects in Romania | 2026","description":"Legal due diligence for solar and BESS projects in Romania: land, ATR, 2026 ANRE guarantees, ready-to-build, CEISD and the Competition Council.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adesman.ro\/en\/due-diligence-solar-bess-projects-romania\/","og_locale":"en_GB","og_type":"article","og_title":"Due diligence juridic proiect fotovoltaic \u0219i BESS | Ghid 2026","og_description":"Due diligence juridic proiect fotovoltaic sau BESS: teren, ATR, garan\u021biile ANRE din 2026, ready-to-build, CEISD \u0219i Consiliul Concuren\u021bei.","og_url":"https:\/\/adesman.ro\/en\/due-diligence-solar-bess-projects-romania\/","og_site_name":"Adesman &amp; Asocia\u021bii","article_publisher":"https:\/\/www.facebook.com\/adesman.asociatii","article_published_time":"2026-10-27T05:39:22+00:00","article_modified_time":"2026-10-27T05:47:59+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp","type":"image\/webp"}],"author":"Diana Adesman","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Diana Adesman","Estimated reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#article","isPartOf":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/"},"author":{"name":"Diana Adesman","@id":"https:\/\/adesman.ro\/ro\/#\/schema\/person\/7348f53c11f4ae0edede533b7c94f135"},"headline":"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD","datePublished":"2026-10-27T05:39:22+00:00","dateModified":"2026-10-27T05:47:59+00:00","mainEntityOfPage":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/"},"wordCount":3403,"publisher":{"@id":"https:\/\/adesman.ro\/ro\/#organization"},"image":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp","keywords":["BESS","CEISD","Due diligence","Energie regenerabil\u0103","Investi\u021bii energetice","Racordare la re\u021bea","Stocarea energiei"],"articleSection":["Energie"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/","url":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/","name":"Legal Due Diligence for PV and BESS Projects in Romania | 2026","isPartOf":{"@id":"https:\/\/adesman.ro\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#primaryimage"},"image":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp","datePublished":"2026-10-27T05:39:22+00:00","dateModified":"2026-10-27T05:47:59+00:00","description":"Legal due diligence for solar and BESS projects in Romania: land, ATR, 2026 ANRE guarantees, ready-to-build, CEISD and the Competition Council.","breadcrumb":{"@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#primaryimage","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/due-diligence-juridic-proiect-fotovoltaic-bess-romania.webp","width":1600,"height":900,"caption":"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD"},{"@type":"BreadcrumbList","@id":"https:\/\/adesman.ro\/due-diligence-proiect-fotovoltaic-bess\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adesman.ro\/"},{"@type":"ListItem","position":2,"name":"Due diligence juridic la achizi\u021bia unui proiect fotovoltaic sau BESS \u00een Rom\u00e2nia: checklist, RTB \u0219i autorizarea CEISD"}]},{"@type":"WebSite","@id":"https:\/\/adesman.ro\/ro\/#website","url":"https:\/\/adesman.ro\/ro\/","name":"Adesman &amp; Asocia\u021bii","description":"The art of law. Excellence in every detail.","publisher":{"@id":"https:\/\/adesman.ro\/ro\/#organization"},"alternateName":"Adesman & Asocia\u021bii","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adesman.ro\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":["Organization","LegalService"],"@id":"https:\/\/adesman.ro\/ro\/#organization","name":"Adesman &amp; Asocia\u021bii","alternateName":["Adesman & Associates","Adesman si Asociatii","\u963f\u5fb7\u65af\u66fc\u5f8b\u5e08\u4e8b\u52a1\u6240"],"url":"https:\/\/adesman.ro\/ro\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/adesman.ro\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2022\/07\/adesman-logo-site-1.png","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2022\/07\/adesman-logo-site-1.png","width":500,"height":260,"caption":"Adesman & Asocia\u021bii"},"image":{"@id":"https:\/\/adesman.ro\/ro\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/adesman.asociatii","https:\/\/www.linkedin.com\/company\/adesman-asociatii\/"],"telephone":"+40 31 420 17 48","email":"office@adesman.ro","address":{"@type":"PostalAddress","streetAddress":"Str. Aviator Maior \u0218tefan S\u0103n\u0103tescu nr. 64","addressLocality":"Bucure\u0219ti","addressRegion":"Sector 1","postalCode":"011478","addressCountry":"RO"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"19:00"}],"areaServed":{"@type":"Country","name":"Romania"},"foundingDate":"2022","hasMap":"https:\/\/www.google.com\/maps\/search\/?api=1&query=Adesman%20%26%20Asocia%C8%9Bii%2C%20Str.%20Aviator%20Maior%20%C8%98tefan%20S%C4%83n%C4%83tescu%2064%2C%20011478%20Bucure%C8%99ti","knowsLanguage":["ro","en","de","fr","es","it"],"description":"Bucharest law firm: litigation and arbitration, public procurement and PPP, energy, real estate and construction, corporate and M&A, tax and employment law.","knowsAbout":["Litigation and arbitration","Public procurement and PPP","Energy and sustainability law","Renewable energy and battery storage (BESS) projects","Real estate, construction and infrastructure law","Corporate and commercial law","Mergers and acquisitions (M&A)","Tax law","Employment law","Foreign direct investment screening","White-collar crime","Competition law","Enforcement of foreign judgments"],"employee":[{"@type":"Person","name":"Diana Adesman","jobTitle":"Managing Partner","url":"https:\/\/adesman.ro\/en\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/"},{"@type":"Person","name":"Ciprian Nicu","jobTitle":"Partner","url":"https:\/\/adesman.ro\/en\/echipa-adesman-asociatii\/ciprian-nicu-adesman-asociatii\/"},{"@type":"Person","name":"Oana \u0218inca","jobTitle":"Partner","url":"https:\/\/adesman.ro\/en\/echipa-adesman-asociatii\/oana-sinca-adesman-asociatii\/"},{"@type":"Person","name":"Alexandra Jitea","jobTitle":"Managing Associate","url":"https:\/\/adesman.ro\/en\/echipa-adesman-asociatii\/alexandra-jitea-adesman-asociatii\/"}]},{"@type":"Person","@id":"https:\/\/adesman.ro\/ro\/#\/schema\/person\/7348f53c11f4ae0edede533b7c94f135","name":"Diana Adesman","image":{"@type":"ImageObject","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1.webp","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1.webp","caption":"Diana Adesman"},"description":"Diana Adesman is the Managing Partner and founder of Adesman &amp; Asocia\u021bii, with over 17 years of legal practice, 13 of them at renowned law firms. Her work covers complex domestic and international litigation and commercial arbitration, as well as advice on real estate, infrastructure and renewable energy projects, including disputes under FIDIC contracts.","sameAs":["https:\/\/www.linkedin.com\/in\/diana-adesman-2b3b4b52\/"],"url":"https:\/\/adesman.ro\/en\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/","jobTitle":"Managing Partner","worksFor":{"@id":"https:\/\/adesman.ro\/ro\/#organization"}}]}},"_links":{"self":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/comments?post=452"}],"version-history":[{"count":3,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/452\/revisions"}],"predecessor-version":[{"id":465,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/452\/revisions\/465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/media\/453"}],"wp:attachment":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/media?parent=452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/categories?post=452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/tags?post=452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}