{"id":282,"date":"2026-09-22T19:33:10","date_gmt":"2026-09-22T19:33:10","guid":{"rendered":"https:\/\/adesman.ro\/?p=282"},"modified":"2026-10-29T15:50:41","modified_gmt":"2026-10-29T15:50:41","slug":"renewable-energy-investments","status":"publish","type":"post","link":"https:\/\/adesman.ro\/en\/investitii-energie-regenerabila\/","title":{"rendered":"Renewable Energy Investments in Romania: Legal Guide"},"content":{"rendered":"<h1 class=\"wp-block-heading\">Renewable energy investments in Romania: land, grid connection and authorisation<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Romania remains an attractive market for renewable energy investments, particularly in solar, onshore wind and energy storage projects. However, developing or acquiring a renewable energy project requires careful coordination between <strong>land rights, urban planning and construction requirements, grid connection, environmental permitting and ANRE authorisation<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recent legislative changes, including Romania\u2019s new planning and construction framework and the introduction of a competitive grid capacity allocation mechanism from 2026, make early-stage legal due diligence increasingly important for investors.<\/p>\n\n\n<aside class=\"tldr\" data-adesman aria-labelledby=\"tldr1\"><div class=\"tldr__head\"><p class=\"tldr__title\" id=\"tldr1\">In brief<\/p><\/div><ul class=\"tldr__list\" role=\"list\"><li style=\"--i:0\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>The urban planning certificate for a solar or wind farm can be obtained without holding a right in rem over the land. The land right must, however, be secured before construction.<\/span><\/li><li style=\"--i:1\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>On agricultural land outside built-up areas (extravilan), the project is possible under certain conditions, up to 50 ha. The land usually has to be removed from agricultural use.<\/span><\/li><li style=\"--i:2\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>An ATR (Technical Connection Permit) is not enough on its own: its validity, approved capacity, connection point, reinforcement works, guarantees and deadlines all matter.<\/span><\/li><li style=\"--i:3\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>Since 1 January 2026, projects of at least 5 MW are allocated grid capacity through a competitive mechanism (ANRE Order no. 53\/2024).<\/span><\/li><li style=\"--i:4\"><svg class=\"tldr__tick\" viewbox=\"0 0 20 20\" aria-hidden=\"true\"><path d=\"M4.5 10.5l3.6 3.6L15.5 6\"\/><\/svg><span>Grid connection, ANRE authorisation, environmental permits and urban planning are separate processes that must be coordinated.<\/span><\/li><\/ul><\/aside>\n\n\n<h2 class=\"wp-block-heading\" id=\"1-securizarea-terenului-pentru-investitii-in-energie-regenerabila\">1. Securing land for renewable energy investments<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Under Romania\u2019s Code on Spatial Planning, Urban Planning and Construction, which entered into force in August 2026, renewable energy projects qualify as engineering works, as they constitute energy infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This classification is relevant to the permitting process. In particular, an urban planning certificate for engineering works may be requested and issued without the applicant holding a principal right in rem over the relevant land. Consequently, a renewable energy project developer is not required to own the project land or hold a right of superficies (drept de superficie) at the time the urban planning certificate is obtained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, before construction works can be carried out, the developer must secure the land rights required for the issuance and implementation of the building permit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Before securing a site, investors should check not only the title deed and any encumbrances, but also <strong>the cadastral status, the category of use and the agricultural regime of the land, access rights, planning restrictions, and the possibility of using the land for both the project and the infrastructure necessary to connect it to the grid<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Acquiring and securing rights over the land is also covered on our <a href=\"https:\/\/adesman.ro\/en\/real-estate-construction-lawyers-romania\/\">real estate, construction and infrastructure<\/a> page.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-terenurile-agricole-situate-in-extravilan\">2. Agricultural land outside built-up areas<\/h2>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Numerous renewable energy projects in Romania are developed on agricultural land located in rural areas. <a href=\"https:\/\/legislatie.just.ro\/Public\/DetaliiDocument\/258191\" target=\"_self\">Law no. 18\/1991<\/a> establishes a specific regime that allows, subject to the fulfillment of the conditions provided by law, the development on certain categories of agricultural land of capacities for the production of solar and wind energy, of electricity storage units, of transformation stations and of the related infrastructure, generally within the legal limit of <strong>50 hectares<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Development of the project may require the permanent or temporary removal of the relevant area from agricultural use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Romanian legislation also allows, in certain situations, <strong>the dual use of agricultural land, both for agricultural activities and for the production of electricity from renewable sources<\/strong>. This regime can allow only the area actually occupied by the energy infrastructure to be removed from agricultural use, while the remaining area continues to be used for agricultural purposes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-racordarea-la-retea-si-atr\">3. Grid connection and Technical Connection Permit (Aviz Tehnic de Racordare \u2013 ATR)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Grid connection is increasingly becoming one of the main development risks for renewable energy projects in Romania.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">The general procedure is regulated by the ANRE Regulation approved by <strong>Order no. 59\/2013<\/strong>, as subsequently amended and supplemented. This generally involves submitting the application for connection, determining the connection solution, issuing the Technical Connection Permit (<strong>ATR<\/strong>), concluding the connection contract, installing and commissioning the connection facilities, and finally issuing the connection certificate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ATR establishes the technical conditions under which the project can be connected to the public electricity grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Therefore, for investors purchasing a project, the mere existence of an ATR is not sufficient. Due diligence should also analyse <strong>its validity, the approved capacity, the connection point, the grid reinforcement works, costs, guarantees, and implementation deadlines<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">For energy storage projects, grid connection must be assessed separately for withdrawal and injection. We cover these aspects in our <a href=\"https:\/\/adesman.ro\/en\/bess-projects-romania\/\" target=\"_self\">guide to BESS projects in Romania<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-noul-mecanism-de-alocare-a-capacitatii-retelei\">4. The New Grid Capacity Allocation Mechanism<\/h2>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">A particularly important development for investors is the introduction of the grid capacity allocation mechanism for relevant projects with an installed capacity of at least <strong>5 MW<\/strong>, applicable from 1 January 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">According to the methodology approved by <a href=\"https:\/\/anre.ro\/anunt-07-08-2024-cu-privire-la-publicarea-in-limba-engleza-a-anexei-nr-1-la-metodologia-privind-alocarea-capacitatii-retelei-electrice-pentru-racordarea-locurilor-de-producere-a-energiei-electrice\/\" target=\"_self\">ANRE Order No. 53\/2024<\/a>, the available capacity of the network for projects falling within its scope of application is allocated through a competitive mechanism.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">This means <strong>that access to network capacity must currently be treated as a key investment risk, and not just as a technical issue related to the approval process<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Investors should determine at an early stage whether the project falls under the capacity allocation mechanism and analyse the available capacity, the status of the allocation process, the applicable payments and financial guarantees, the connection timeline, as well as the consequences of failing to meet the mandatory development milestones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This aspect is particularly relevant when acquiring projects presented as \u201cready-to-build\u201d or at an advanced stage of development: land rights and permits have limited value if the project does not have a viable and legally secure grid connection solution.<\/p>\n\n\n<aside class=\"consult on-dark\" data-adesman aria-label=\"Talk to a lawyer\"><div class=\"consult__body\">\n<p class=\"translation-block\"><strong>Assessing a project marketed as \u201cready-to-build\u201d?<\/strong> We review the ATR, grid capacity and connection deadlines before signing, so you know exactly what you are buying.<\/p>\n<p>  \n<\/div><div class=\"consult__foot\"><a class=\"btn btn--light\" href=\"https:\/\/adesman.ro\/en\/contact\/\"><span class=\"btn__label\">Contact us \u2192<\/span><span class=\"btn__icon\" aria-hidden=\"true\"><svg viewbox=\"0 0 24 24\"><path d=\"M5 12h13M13 6l6 6-6 6\"\/><\/svg><\/span><\/a><p class=\"consult__team\"><span class=\"consult__faces\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1-150x150.webp\" alt=\"Diana Adesman\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Ciprian-Nicu-150x150.webp\" alt=\"Ciprian Nicu\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Oana-Sinca-150x150.webp\" alt=\"Oana \u0218inca\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Alexandra-Toader-150x150.webp\" alt=\"Alexandra Jitea\" width=\"44\" height=\"44\" loading=\"lazy\"><\/span><span data-no-translation=\"\">Our team engages immediately with every matter.<\/span><\/p><\/div><\/aside>\n\n\n<h2 class=\"wp-block-heading\" id=\"5-autorizarea-si-licentierea-anre\">5. ANRE authorisation and licensing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Grid connection is distinct from the authorisation and licensing regime administered by the Romanian Energy Regulatory Authority (<strong>ANRE<\/strong>).<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">According to Law no. 123\/2012, projects exceeding the threshold laid down by law require <strong>an establishment authorisation<\/strong>, while projects falling under the statutory exemption are subject to the applicable notification regime.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Commercial operation of the generation facility is subsequently subject to the applicable ANRE licensing requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Investors should therefore ensure that <strong>the land, construction, grid connection and <a href=\"https:\/\/adesman.ro\/en\/areas-of-practice\/\" target=\"_self\">ANRE authorisation<\/a> processes are coordinated<\/strong>, as delays or changes in any one of these processes may affect the validity or timing of the others.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6-autorizarea-din-perspectiva-protectiei-mediului\">6. Environmental Permitting<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Renewable energy projects are subject to Romanian environmental protection legislation, which implements the relevant requirements of European Union law.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Depending on the location, size and characteristics of the project, the competent environmental protection authority may require <strong>an environmental impact assessment<\/strong>, an appropriate assessment in relation to Natura 2000 sites and\/or an assessment of the impact on water bodies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the location, additional permits and approvals may be required, including in relation to protected areas, archaeological heritage, water management, aviation, defence infrastructure or land reclamation systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Any environmental constraints should ideally be identified at the stage of <strong>selecting the location and conducting legal due diligence<\/strong>, rather than after significant costs have already been incurred for the development of the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7-scheme-de-sprijin-si-aspecte-fiscale\">7. Support Schemes and Tax Considerations<\/h2>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Romania has implemented several support mechanisms for <strong>investments in renewable energy<\/strong>, including <strong>the Contracts for Difference (CfD) scheme<\/strong> and financing opportunities available through European and national programmes, including the Modernisation Fund.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These mechanisms can significantly improve the economic parameters of a project, but eligibility and the granting of support are subject to the rules of each scheme and should not be considered as automatically available for all renewable energy projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Similarly, Romanian law does not provide for a general tax exemption simply because a project produces energy from renewable sources. Investors should analyse the tax implications of the specific investment structure, including corporate income tax, VAT, local taxes and duties, as well as the tax treatment of the acquisition and financing structure. For recent developments regarding taxation in the energy sector, please also see the Adesman &amp; Asocia\u021bii analysis regarding <strong><a href=\"https:\/\/adesman.ro\/en\/adesman-and-associates-change-the-rules-of-the-game-in-favour-of-the-private-energy-sector\/\">Energy Transition Fund<\/a><\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">The legal checks when buying a project under development are set out in detail in our guide to <a href=\"https:\/\/adesman.ro\/en\/due-diligence-solar-bess-projects-romania\/\">legal due diligence for photovoltaic and BESS projects<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"concluzii-esentiale-pentru-investitorii-internationali\">Key conclusions for international investors<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A renewable energy project in Romania should not be assessed solely by reference to secured land or permits already obtained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">For investors considering <strong>investments in renewable energy in Romania<\/strong>, the essential question is whether the project has a <strong>coherent and bankable development path<\/strong>: adequate land rights that are enforceable against third parties, a viable situation from the perspective of urban planning and the agricultural land regime, a secure or realistically achievable connection capacity, valid environmental and construction permits, and a clear path towards ANRE authorisation and commercial operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Carrying out early-stage coordinated legal due diligence on all these matters can enable the identification of critical development risks before committing significant capital and can substantially contribute to the project's bankability and its preparation for a potential transaction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"intrebari-frecvente-despre-investitiile-in-energie-regenerabila-in-romania\">Frequently asked questions about renewable energy investments in Romania<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"poate-un-investitor-strain-sa-dezvolte-sau-sa-achizitioneze-un-proiect-de-energie-regenerabila-in-romania\">Can a foreign investor develop or acquire a renewable energy project in Romania?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Foreign investors can develop or acquire renewable energy projects in Romania, including photovoltaic, wind and energy storage projects. Depending on the structure and value of the transaction, the activities of the target company and other relevant circumstances, the investment may be subject to additional requirements, including those relating to investment screening and the foreign direct investment screening regime (CEISD).<\/p>\n\n\n<p class=\"wp-block-paragraph translation-block\">The rules on investment authorisation are explained in our <a href=\"https:\/\/adesman.ro\/en\/fdi-screening-romania\/\" target=\"_self\">guide to CEISD authorisation<\/a>.<\/p>\n\n<h3 class=\"wp-block-heading\" id=\"este-necesar-ca-dezvoltatorul-unui-parc-fotovoltaic-sau-eolian-sa-fie-proprietarul-terenului\">Is it necessary for the developer of a photovoltaic or wind farm to be the landowner?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. The developer does not need to be the landowner at all stages of the project. Other rights that permit the development and exploitation of the project may also be used, under the conditions provided by law.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under the current framework on spatial planning, urban planning and construction, for engineering works the urban planning certificate may be requested and issued without the applicant holding a principal right in rem over the land. However, in order to carry out the works, the right over the land necessary for authorising and executing the project must be secured.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"se-poate-construi-un-parc-fotovoltaic-pe-teren-agricol-extravilan\">Can a photovoltaic park be built on agricultural land outside built-up areas (extravilan)?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Under certain conditions, yes. Law no. 18\/1991 allows certain renewable energy generation facilities and related infrastructure to be located on certain categories of agricultural land outside built-up areas, subject to the conditions and limits laid down by law, including, under the relevant regime, the 50-hectare limit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the project and the land, permanent or temporary withdrawal from agricultural use may be required. In certain situations, dual land use for agricultural activities and renewable electricity generation is also permitted.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-este-atr-ul-si-de-ce-este-important-pentru-un-proiect-de-energie-regenerabila\">What is the ATR and why is it important for a renewable energy project?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The ATR \u2013 Technical Connection Permit (Aviz Tehnic de Racordare) \u2013 establishes the technical conditions under which the project can be connected to the public electricity grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For an investor, the mere existence of an ATR is not sufficient to assess the project\u2019s grid connection status. The analysis should also cover its validity, approved capacity, connection point, any required grid reinforcement works, associated costs and guarantees, as well as the deadlines and obligations applicable to the implementation of the connection.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"cum-se-aloca-in-2026-capacitatea-retelei-pentru-proiectele-de-minimum-5-mw\">How will grid capacity be allocated in 2026 for projects of at least 5 MW?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For projects falling within the scope of the methodology approved by ANRE Order no. 53\/2024, available grid capacity is allocated through the competitive mechanism applicable from 1 January 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Consequently, for projects targeted by this regime, the legal and investment analysis must consider not only the existence of network infrastructure, but also effective access to capacity, the status of the allocation procedure, the associated costs and guarantees, as well as the timelines applicable to the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"este-suficient-ca-un-proiect-sa-aiba-atr-pentru-a-fi-considerat-ready-to-build\">Is it sufficient for a project to have an ATR to be considered \u201cready-to-build\u201d?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not necessarily. \u201cReady-to-build\u201d does not, in itself, represent a guarantee that all the legal, technical and administrative conditions required to start construction are met.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of a due diligence, the concrete situation of the project must be verified, including land rights, town planning, the building permit, the connection and grid capacity situation, environmental permits, ANRE authorisation and any conditions, deadlines or obligations not yet fulfilled.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-autorizatii-anre-sunt-necesare-pentru-un-proiect-de-energie-regenerabila\">What ANRE authorisations are required for a renewable energy project?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The applicable regime depends on the characteristics of the project and the thresholds provided for by the legislation in force. Law no. 123\/2012 governs the establishment authorisation for projects exceeding the applicable legal threshold, and projects benefiting from the statutory exemption are subject to the corresponding notification regime.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The commercial exploitation of the generation capacity is, separately, subject to the applicable ANRE licensing requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ce-ar-trebui-verificat-inainte-de-achizitia-unui-proiect-de-energie-regenerabila-in-romania\">What should be checked before purchasing a renewable energy project in Romania?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A legal due diligence of a renewable energy project can cover, depending on the transaction structure, the project company and its corporate status, land rights, urban planning and construction, grid connection and the ATR, grid capacity, ANRE authorisations, environmental aspects, relevant contracts, financing, litigation and any investment screening requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For projects in an advanced stage of development, particular attention must also be paid to deadlines, milestones, guarantees, and the conditions on which the maintenance of rights already obtained depends.<\/p>\n\n\n<aside class=\"consult on-dark\" data-adesman aria-label=\"Talk to a lawyer\"><div class=\"consult__body\">\n<p class=\"translation-block\"><strong>Considering the acquisition or development of a solar or wind project in Romania?<\/strong> We review the land, grid connection, grid capacity and permits before signing, and tell you clearly what risks the project carries and how they should be reflected in the contract.<\/p>\n<p>  \n<\/div><div class=\"consult__foot\"><a class=\"btn btn--light\" href=\"https:\/\/adesman.ro\/en\/contact\/\"><span class=\"btn__label\">Schedule a call \u2192<\/span><span class=\"btn__icon\" aria-hidden=\"true\"><svg viewbox=\"0 0 24 24\"><path d=\"M5 12h13M13 6l6 6-6 6\"\/><\/svg><\/span><\/a><p class=\"consult__team\"><span class=\"consult__faces\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1-150x150.webp\" alt=\"Diana Adesman\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Ciprian-Nicu-150x150.webp\" alt=\"Ciprian Nicu\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Oana-Sinca-150x150.webp\" alt=\"Oana \u0218inca\" width=\"44\" height=\"44\" loading=\"lazy\"><img src=\"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Alexandra-Toader-150x150.webp\" alt=\"Alexandra Jitea\" width=\"44\" height=\"44\" loading=\"lazy\"><\/span><span data-no-translation=\"\">Our team engages immediately with every matter.<\/span><\/p><\/div><\/aside>\n\n\n<p class=\"wp-block-paragraph\"><em>This material is of a general and exclusively informative nature and does not constitute legal advice regarding a specific project or investment. The application of the legal framework depends on the characteristics of each project and the legislation and regulations in force at the time of the analysis.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: terenuri, racordare la re\u021bea \u0219i autorizare Rom\u00e2nia r\u0103m\u00e2ne o pia\u021b\u0103 atractiv\u0103 pentru investi\u021biile \u00een energie regenerabil\u0103, \u00een special \u00een proiecte de energie [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":429,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,37],"tags":[35,29,27,31,34,36,32,30,26,28],"class_list":["post-282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energie","category-energie-verde","tag-achizitie-proiect-fotovoltaic-romania","tag-atr-proiect-energie","tag-autorizare-anre","tag-capacitate-retea-5-mw","tag-due-diligence-proiect-energie-regenerabila","tag-investitii-in-energie-regenerabila-in-romania","tag-parc-fotovoltaic-romania","tag-proiecte-energie-regenerabila-romania","tag-racordare-la-retea-energie-regenerabila","tag-teren-agricol-parc-fotovoltaic"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia | Ghid juridic<\/title>\n<meta name=\"description\" content=\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: terenuri, ATR, racordare la re\u021bea, autorizare ANRE \u0219i principalele riscuri juridice.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adesman.ro\/en\/renewable-energy-investments\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia | Ghid juridic\" \/>\n<meta property=\"og:description\" content=\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: terenuri, ATR, racordare la re\u021bea, autorizare ANRE \u0219i principalele riscuri juridice.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adesman.ro\/en\/renewable-energy-investments\/\" \/>\n<meta property=\"og:site_name\" content=\"Adesman &amp; Asocia\u021bii\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/adesman.asociatii\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-22T19:33:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T15:50:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Diana Adesman\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Diana Adesman\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/\"},\"author\":{\"name\":\"Diana Adesman\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/#person\"},\"headline\":\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic\",\"datePublished\":\"2026-09-22T19:33:10+00:00\",\"dateModified\":\"2026-10-29T15:50:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/\"},\"wordCount\":2542,\"publisher\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/investitii-energie-regenerabila-romania-ghid-juridic.webp\",\"keywords\":[\"achizi\u021bie proiect fotovoltaic Rom\u00e2nia\",\"ATR proiect energie\",\"autorizare ANRE\",\"capacitate re\u021bea 5 MW\",\"due diligence proiect energie regenerabil\u0103\",\"investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia\",\"parc fotovoltaic Rom\u00e2nia\",\"proiecte energie regenerabil\u0103 Rom\u00e2nia\",\"racordare la re\u021bea energie regenerabil\u0103\",\"teren agricol parc fotovoltaic\"],\"articleSection\":[\"Energie\",\"Energie Verde\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/\",\"url\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/\",\"name\":\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia | Ghid juridic\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/investitii-energie-regenerabila-romania-ghid-juridic.webp\",\"datePublished\":\"2026-09-22T19:33:10+00:00\",\"dateModified\":\"2026-10-29T15:50:41+00:00\",\"description\":\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: terenuri, ATR, racordare la re\u021bea, autorizare ANRE \u0219i principalele riscuri juridice.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/investitii-energie-regenerabila-romania-ghid-juridic.webp\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/investitii-energie-regenerabila-romania-ghid-juridic.webp\",\"width\":1600,\"height\":900,\"caption\":\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/investitii-energie-regenerabila\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adesman.ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/\",\"name\":\"Adesman & Asocia\u021bii\",\"description\":\"Arta dreptului. Excelen\u021b\u0103 \u00een fiecare detaliu.\",\"publisher\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"},\"alternateName\":\"Adesman & Asocia\u021bii\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adesman.ro\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":[\"Organization\",\"LegalService\"],\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\",\"name\":\"Adesman & Asocia\u021bii\",\"alternateName\":[\"Adesman & Associates\",\"Adesman si Asociatii\",\"\u963f\u5fb7\u65af\u66fc\u5f8b\u5e08\u4e8b\u52a1\u6240\"],\"url\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/adesman-logo-site-1.png\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/adesman-logo-site-1.png\",\"width\":500,\"height\":260,\"caption\":\"Adesman & Asocia\u021bii\"},\"image\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/adesman.asociatii\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adesman-asociatii\\\/\"],\"telephone\":\"+40 31 420 17 48\",\"email\":\"office@adesman.ro\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Str. Aviator Maior \u0218tefan S\u0103n\u0103tescu nr. 64\",\"addressLocality\":\"Bucure\u0219ti\",\"addressRegion\":\"Sector 1\",\"postalCode\":\"011478\",\"addressCountry\":\"RO\"},\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\"],\"opens\":\"09:00\",\"closes\":\"19:00\"}],\"areaServed\":{\"@type\":\"Country\",\"name\":\"Romania\"},\"foundingDate\":\"2022\",\"hasMap\":\"https:\\\/\\\/www.google.com\\\/maps\\\/search\\\/?api=1&query=Adesman%20%26%20Asocia%C8%9Bii%2C%20Str.%20Aviator%20Maior%20%C8%98tefan%20S%C4%83n%C4%83tescu%2064%2C%20011478%20Bucure%C8%99ti\",\"knowsLanguage\":[\"ro\",\"en\",\"de\",\"fr\",\"es\",\"it\"],\"description\":\"Bucharest law firm: litigation and arbitration, public procurement and PPP, energy, real estate and construction, corporate and M&A, tax and employment law.\",\"knowsAbout\":[\"Litigation and arbitration\",\"Public procurement and PPP\",\"Energy and sustainability law\",\"Renewable energy and battery storage (BESS) projects\",\"Real estate, construction and infrastructure law\",\"Corporate and commercial law\",\"Mergers and acquisitions (M&A)\",\"Tax law\",\"Employment law\",\"Foreign direct investment screening\",\"White-collar crime\",\"Competition law\",\"Enforcement of foreign judgments\"],\"employee\":[{\"@type\":\"Person\",\"name\":\"Diana Adesman\",\"jobTitle\":\"Managing Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/adesman-asociatii-team\\\/diana-adesman-adesman-asociatii\\\/\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/#person\"},{\"@type\":\"Person\",\"name\":\"Ciprian Nicu\",\"jobTitle\":\"Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/adesman-asociatii-team\\\/ciprian-nicu-adesman-asociatii\\\/\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/ciprian-nicu-adesman-asociatii\\\/#person\"},{\"@type\":\"Person\",\"name\":\"Oana \u0218inca\",\"jobTitle\":\"Partner\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/adesman-asociatii-team\\\/oana-sinca-adesman-asociatii\\\/\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/oana-sinca-adesman-asociatii\\\/#person\"},{\"@type\":\"Person\",\"name\":\"Alexandra Jitea\",\"jobTitle\":\"Managing Associate\",\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/adesman-asociatii-team\\\/alexandra-jitea-adesman-asociatii\\\/\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/alexandra-jitea-adesman-asociatii\\\/#person\"}],\"legalName\":\"Adesman & Asocia\u021bii \u2013 Societate Civil\u0103 de Avoca\u021bi\",\"taxID\":\"46833017\",\"vatID\":\"RO46833017\",\"founder\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/#person\"},\"memberOf\":{\"@type\":\"Organization\",\"name\":\"Bucharest Bar\",\"url\":\"https:\\\/\\\/www.baroul-bucuresti.ro\\\/\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":44.450105,\"longitude\":26.0837}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/echipa-adesman-asociatii\\\/diana-adesman-adesman-asociatii\\\/#person\",\"name\":\"Diana Adesman\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Diana-Adesman-1.webp\",\"contentUrl\":\"https:\\\/\\\/adesman.ro\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Diana-Adesman-1.webp\",\"caption\":\"Diana Adesman\"},\"description\":\"Diana Adesman este Managing Partner \u0219i fondatoarea Adesman & Asocia\u021bii, cu peste 17 ani de experien\u021b\u0103 \u00een avocatur\u0103, dintre care 13 \u00een firme de avocatur\u0103 de renume. Activitatea sa acoper\u0103 litigii complexe, interne \u0219i interna\u021bionale, \u0219i arbitraj comercial, precum \u0219i asisten\u021b\u0103 pentru proiecte imobiliare, de infrastructur\u0103 \u0219i de energie regenerabil\u0103, inclusiv dispute din contracte FIDIC.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/diana-adesman-2b3b4b52\\\/\"],\"url\":\"https:\\\/\\\/adesman.ro\\\/en\\\/adesman-asociatii-team\\\/diana-adesman-adesman-asociatii\\\/\",\"jobTitle\":\"Managing Partner\",\"worksFor\":{\"@id\":\"https:\\\/\\\/adesman.ro\\\/ro\\\/#organization\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renewable Energy Investments in Romania | Legal Guide","description":"Renewable energy investments in Romania: land, grid connection (ATR), ANRE authorisation and the principal legal risks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adesman.ro\/en\/renewable-energy-investments\/","og_locale":"en_GB","og_type":"article","og_title":"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia | Ghid juridic","og_description":"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: terenuri, ATR, racordare la re\u021bea, autorizare ANRE \u0219i principalele riscuri juridice.","og_url":"https:\/\/adesman.ro\/en\/renewable-energy-investments\/","og_site_name":"Adesman &amp; Asocia\u021bii","article_publisher":"https:\/\/www.facebook.com\/adesman.asociatii","article_published_time":"2026-09-22T19:33:10+00:00","article_modified_time":"2026-10-29T15:50:41+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp","type":"image\/webp"}],"author":"Diana Adesman","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Diana Adesman","Estimated reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#article","isPartOf":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/"},"author":{"name":"Diana Adesman","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/#person"},"headline":"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic","datePublished":"2026-09-22T19:33:10+00:00","dateModified":"2026-10-29T15:50:41+00:00","mainEntityOfPage":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/"},"wordCount":2542,"publisher":{"@id":"https:\/\/adesman.ro\/ro\/#organization"},"image":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#primaryimage"},"thumbnailUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp","keywords":["achizi\u021bie proiect fotovoltaic Rom\u00e2nia","ATR proiect energie","autorizare ANRE","capacitate re\u021bea 5 MW","due diligence proiect energie regenerabil\u0103","investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia","parc fotovoltaic Rom\u00e2nia","proiecte energie regenerabil\u0103 Rom\u00e2nia","racordare la re\u021bea energie regenerabil\u0103","teren agricol parc fotovoltaic"],"articleSection":["Energie","Energie Verde"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/","url":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/","name":"Renewable Energy Investments in Romania | Legal Guide","isPartOf":{"@id":"https:\/\/adesman.ro\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#primaryimage"},"image":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#primaryimage"},"thumbnailUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp","datePublished":"2026-09-22T19:33:10+00:00","dateModified":"2026-10-29T15:50:41+00:00","description":"Renewable energy investments in Romania: land, grid connection (ATR), ANRE authorisation and the principal legal risks.","breadcrumb":{"@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adesman.ro\/investitii-energie-regenerabila\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#primaryimage","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2026\/10\/investitii-energie-regenerabila-romania-ghid-juridic.webp","width":1600,"height":900,"caption":"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic"},{"@type":"BreadcrumbList","@id":"https:\/\/adesman.ro\/investitii-energie-regenerabila\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adesman.ro\/"},{"@type":"ListItem","position":2,"name":"Investi\u021bii \u00een energie regenerabil\u0103 \u00een Rom\u00e2nia: ghid juridic"}]},{"@type":"WebSite","@id":"https:\/\/adesman.ro\/en\/#website","url":"https:\/\/adesman.ro\/en\/","name":"Adesman &amp; Asocia\u021bii","description":"The art of law. Excellence in every detail.","publisher":{"@id":"https:\/\/adesman.ro\/ro\/#organization"},"alternateName":"Adesman & Asocia\u021bii","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adesman.ro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":["Organization","LegalService"],"@id":"https:\/\/adesman.ro\/ro\/#organization","name":"Adesman &amp; Asocia\u021bii","alternateName":["Adesman & Associates","Adesman si Asociatii","\u963f\u5fb7\u65af\u66fc\u5f8b\u5e08\u4e8b\u52a1\u6240"],"url":"https:\/\/adesman.ro\/ro\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/adesman.ro\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2022\/07\/adesman-logo-site-1.png","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2022\/07\/adesman-logo-site-1.png","width":500,"height":260,"caption":"Adesman & Asocia\u021bii"},"image":{"@id":"https:\/\/adesman.ro\/ro\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/adesman.asociatii","https:\/\/www.linkedin.com\/company\/adesman-asociatii\/"],"telephone":"+40 31 420 17 48","email":"office@adesman.ro","address":{"@type":"PostalAddress","streetAddress":"Str. Aviator Maior \u0218tefan S\u0103n\u0103tescu nr. 64","addressLocality":"Bucure\u0219ti","addressRegion":"Sector 1","postalCode":"011478","addressCountry":"RO"},"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday"],"opens":"09:00","closes":"19:00"}],"areaServed":{"@type":"Country","name":"Romania"},"foundingDate":"2022","hasMap":"https:\/\/www.google.com\/maps\/search\/?api=1&query=Adesman%20%26%20Asocia%C8%9Bii%2C%20Str.%20Aviator%20Maior%20%C8%98tefan%20S%C4%83n%C4%83tescu%2064%2C%20011478%20Bucure%C8%99ti","knowsLanguage":["ro","en","de","fr","es","it"],"description":"Bucharest law firm: litigation and arbitration, public procurement and PPP, energy, real estate and construction, corporate and M&A, tax and employment law.","knowsAbout":["Litigation and arbitration","Public procurement and PPP","Energy and sustainability law","Renewable energy and battery storage (BESS) projects","Real estate, construction and infrastructure law","Corporate and commercial law","Mergers and acquisitions (M&A)","Tax law","Employment law","Foreign direct investment screening","White-collar crime","Competition law","Enforcement of foreign judgments"],"employee":[{"@type":"Person","name":"Diana Adesman","jobTitle":"Managing Partner","url":"https:\/\/adesman.ro\/en\/adesman-asociatii-team\/diana-adesman-adesman-asociatii\/","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/#person"},{"@type":"Person","name":"Ciprian Nicu","jobTitle":"Partner","url":"https:\/\/adesman.ro\/en\/adesman-asociatii-team\/ciprian-nicu-adesman-asociatii\/","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/ciprian-nicu-adesman-asociatii\/#person"},{"@type":"Person","name":"Oana \u0218inca","jobTitle":"Partner","url":"https:\/\/adesman.ro\/en\/adesman-asociatii-team\/oana-sinca-adesman-asociatii\/","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/oana-sinca-adesman-asociatii\/#person"},{"@type":"Person","name":"Alexandra Jitea","jobTitle":"Managing Associate","url":"https:\/\/adesman.ro\/en\/adesman-asociatii-team\/alexandra-jitea-adesman-asociatii\/","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/alexandra-jitea-adesman-asociatii\/#person"}],"legalName":"Adesman & Asocia\u021bii \u2013 Societate Civil\u0103 de Avoca\u021bi","taxID":"46833017","vatID":"RO46833017","founder":{"@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/#person"},"memberOf":{"@type":"Organization","name":"Bucharest Bar","url":"https:\/\/www.baroul-bucuresti.ro\/"},"geo":{"@type":"GeoCoordinates","latitude":44.450105,"longitude":26.0837}},{"@type":"Person","@id":"https:\/\/adesman.ro\/ro\/echipa-adesman-asociatii\/diana-adesman-adesman-asociatii\/#person","name":"Diana Adesman","image":{"@type":"ImageObject","url":"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1.webp","contentUrl":"https:\/\/adesman.ro\/wp-content\/uploads\/2024\/11\/Diana-Adesman-1.webp","caption":"Diana Adesman"},"description":"Diana Adesman is the Managing Partner and founder of Adesman &amp; Asocia\u021bii, with over 17 years of legal practice, 13 of them at renowned law firms. Her work covers complex domestic and international litigation and commercial arbitration, as well as advice on real estate, infrastructure and renewable energy projects, including disputes under FIDIC contracts.","sameAs":["https:\/\/www.linkedin.com\/in\/diana-adesman-2b3b4b52\/"],"url":"https:\/\/adesman.ro\/en\/adesman-asociatii-team\/diana-adesman-adesman-asociatii\/","jobTitle":"Managing Partner","worksFor":{"@id":"https:\/\/adesman.ro\/ro\/#organization"}}]}},"_links":{"self":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/comments?post=282"}],"version-history":[{"count":15,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/282\/revisions"}],"predecessor-version":[{"id":495,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/posts\/282\/revisions\/495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/media\/429"}],"wp:attachment":[{"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/media?parent=282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/categories?post=282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/adesman.ro\/en\/wp-json\/wp\/v2\/tags?post=282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}